Thank you for Subscribing to Construction Business Review Weekly Brief
Anchal Singour, Project ManagerAs a feature stair specialist, Synergi offers its signature design-assist methodology to facilitate smarter design and smoother execution. The company operates from multiple corporate offices and fabrication shops, completing iconic projects across North America and the UK while delivering enhanced-value, turnkey stair solutions for large and complex projects.
Synergi stays involved from early design discussions through fabrication and installation, helping architects preserve their ideas while keeping the finished stair practical and on schedule.
Much of Synergi’s value comes from getting involved before a design becomes difficult to change. A feature stair affects the structure, slab opening, ceiling, lighting, finishes, and other trades. Its engineers review supports and connections, while the pre-construction team provides pricing and alternatives.
This involvement has produced measurable results on demanding commercial projects, where every detail matters. On a Google project, Synergi worked through engineering options for four custom floating stairs and reduced stair costs by 25 percent. On a Walmart project in Bentonville, Arkansas, early planning helped streamline design, cut costs, and drastically reduce installation time on 36 interconnected stairs for prefabrication.
Synergi does not treat engineering as a reason to dilute an architect’s vision. It works hand in hand with the architect throughout the design-assist process to protect the design and ensure constructability. It might be the slimness of a stringer, the feeling that a stair is floating, continuous glass, or the warmth of a wood tread.
The team then finds ways to meet structural and safety requirements without compromising those details. Licensed professional engineers and certified welding inspectors are involved, with vibration and deflection considered alongside strength. Cost is addressed early through choices involving connections, steel sections, finishes, and fabrication methods.
On the Walmart project, optimization across 36 stairs reduced steel use by 86 tons without changing the finished experience for people using the building.
Experience That Shows
Synergi now installs more than 200 feature stairs a year from its 50,000-square-foot fabrication facility in in Maryland and its affiliated fabrication partners across the country. Its projects have included work for Google, Walmart, Microsoft, JP Morgan Chase, Lego, Ferrari, and Amazon.
For complex projects, a project manager stays involved from pre-construction through closeout. That continuity matters when schedules shift, details change, and teams need answers.
“Our job is to make that moment work and to deliver it within the realities of a construction schedule,” says Anchal Singour, Project Manager at Synergi.
A More Controlled Way to Build
Prefabrication has always been an important part of Synergi’s approach. Complete stair assemblies can be fabricated and finished in the shop before reaching the site. They can then be craned into position rather than assembled through extended field work.
At Walmart, 36 prefabricated stairs were delivered across 12 office buildings. Installation time fell from a week to a day. The approach also meant less cutting and welding on site, fewer deliveries, less disruption, and better control over waste and quality.
Looking Across the Atlantic
Synergi has expanded its capabilities through the acquisition of Alpine Group UK, a company with a long history of staircase and structural steelwork in Britain.
The combination gives clients on both sides of the Atlantic a consistent way to manage projects. For Synergi, it creates room for growth without losing its hands-on approach.
After four decades of adapting to changing markets and taking on difficult projects, Synergi continues to invest in its people, systems, and craftsmanship. That direction has earned the company a clear distinction: Synergi has been named Top Architectural Stairs Fabricator of the Year 2026