CLOSE
  • Specialty Construction Europe
  • Roofing and Siding Systems
  • Doors and windows
  • HVAC
  • Steel Building APAC
  • Kitchen and Bath Europe
  • Construction Interiors
  • Construction Demolition and Recycling Europe
  • Construction MENA
  • Architectural Glass
  • Modular and Prefab Construction
  • Construction Engineering Services
  • Safety and Compliance Europe
  • Wall Systems
  • Waterproofing APAC
  • Flooring System
  • Forensic and Owners Representative
  • Startups APAC
  • Architectural Glass APAC
  • Roofing and Siding Systems Europe
  • Mechanical Electrical and Plumbing
  • Construction Bidding and Auctions
  • Architecture and Design Services
  • Concretes, Aggregates and Materials
  • Safety and Compliance APAC
  • Construction Demolition and Recycling APAC
  • Steel Building Europe
  • Construction Consulting
  • Roofing Systems APAC
  • Workforce Management and Staffing
  • Construction Latam
  • Landscaping
  • Construction Marketing
  • Modular Construction APAC
  • Modular Construction Canada
  • Construction Engineering MENA
  • Swimming Pool Construction
  • Construction Engineering Canada
  • Specialty Construction
  • Commercial Contractors
  • Scaffolding Contractors
  • Building Restoration and Maintenance
  • Doors and Windows Canada
  • Sustainable Construction APAC
  • Construction Law
  • Architectural Glass Canada
  • Building Information Modeling APAC
  • Construction Staffing
  • Insulation, Coating and Waterproofing
  • Cold Storage Construction Canada
  • Construction Management Canada
  • Swimming Pool Construction Canada
  • Scaffolding Canada
  • Flooring System APAC
  • Pre-Construction Services
  • Construction Staffing Europe
  • Precast Concrete Europe
  • Cold Storage Construction APAC
  • Apartment and Condominium Contractors Canada
  • MEP Canada
  • Foundation Construction Canada
  • Outdoor Construction
  • Construction Law APAC
  • Construction Saudi Arabia
  • MEP APAC
  • Decking Canada
  • Kitchen and Bath
  • Building Sealing Solutions Europe
  • Swimming Pool Construction APAC
  • Mould Remediation and Testing Europe
  • Mechanical Contractor Canada
  • Construction Consulting Europe
  • Construction Coating Europe
  • Landscaping Canada
  • Construction Management
  • Construction Management APAC
  • Flooring Systems Europe
  • Dummy
  • Commercial Contractors APAC
  • Commercial Contractors Europe
  • Concretes, Aggregates and Materials Europe
  • Concretes, Aggregates and Construction Materials APAC
  • Construction Cladding APAC
  • Concrete Canada
  • Residential Construction
  • Building Restoration and Maintenance Canada
  • Pre-Construction Services Europe
  • Outdoor Construction Europe
  • Construction Interiors Europe
  • Modular and Prefab Construction Europe
  • Buinding Restoration and Maintenance Europe
  • Construction Forensic and Owners Representative Europe
  • Professional Services
  • Structures
  • Systems
  • Roofing and Siding Systems Canada
  • Professional Services Canada
  • Structures Canada
  • Systems Canada
  • Professional Services Europe
  • Structures Europe
  • Systems Europe
  • Training Services
  • Geotechnical Services Canada
Skip to: Curated Story Group 1
Construction Business Review
US
EUROPE
APAC
CANADA
MENA
LATAM
AUSTRALIA
About Us Conference Partner With Us
  • US
    • US
    • EUROPE
    • CANADA
    • AUSTRALIA
  • Professional Services
    Architecture and Design Services
    Building Restoration and Maintenance
    Construction Bidding and Auctions
    Construction Consulting
    Construction Engineering Services
    Construction Law
    Construction Management
    Construction Marketing
    Construction Staffing
    Forensic and Owners Representative
    Pre-Construction Services
    Scaffolding Contractors
    Training Services
  • Structures
    Commercial Contractors
    Construction Interiors
    HVAC
    Landscaping
    Mechanical Electrical and Plumbing
    Modular and Prefab Construction
    Outdoor Construction
    Residential Construction
    Specialty Construction
    Swimming Pool Construction
  • Systems
    Architectural Glass
    Concretes, Aggregates and Materials
    Doors and windows
    Flooring System
    Insulation, Coating and Waterproofing
    Kitchen and Bath
    Roofing and Siding Systems
    Wall Systems
  • Leadership Perspectives
  • Insights
  • Research
  • News
  • Magazines
  • CXO Awards

Thank you for Subscribing to Construction Business Review Weekly Brief

A featured contribution from Leadership Perspectives: a curated forum reserved for leaders nominated by our subscribers and vetted by the Construction Business Review Advisory Board.

Aldridge

Chris Weir, Director of Agile Operations

Custom Solutions for Runway Rehab: Innovative Equipment & Tracking Applications

Chris Weir

Chris Weir

In Los Angeles, CA, Aldridge crews utilized subject matter experts and an in-house development team to provide a transformative innovative solution to a runway rehabilitation project. 


The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States. The rehabilitation took place during a 60-day closure of the runway. The overall scope of the project was removal and replacement of pavement and electrical infrastructure on 6000LF of the runway. This required complete removal and replacement of the in-pavement light bases within the paving area as well as installation of 700+ new light fixtures and 80,000LF of 5kV Cable.


As part of this pavement removal and replacement, Aldridge removed and replaced 300+ in-pavement light bases which required coring and removing a 3 ft Diameter x 3 ft Deep at each location. Known for innovative solutions in project execution, Aldridge’s innovation team custom-built a coring machine to install the new lights. This core barrel machine was specifically designed for work done at airports and has the ability to core up to a 48" diameter at a speed three times as fast as the traditional machines that are widely used throughout the industry.


Due to the project schedule constraints, Aldridge was required to complete the removal and replacement of the 300 base cans in just under two weeks, requiring crews to work around the clock for the first two weeks of the runway closure. The tight initial schedule for Aldridge to remove and replace the base cans required much more labor and project management oversight than a typical project running one shift. Management resources and subject matter experts from all over the company were brought in to work hand-in-hand with our West Coast teams to provide this extra support and oversight during the round-the-clock operation. 


With a large number of base cans and light fixtures to be replaced, the risk of re-work was ever-present. To eliminate this rework risk, the project team worked with our in-house IT development team to create a custom application for this project. This app would track the install process at each light location and provide the team with a quality checklist and area to provide photos that would ensure all work was complete and documented when each step of the installation was complete. The application allowed the third-party project QAQC representatives access to the database, which allowed them to sign off and accept the work. This documentation became a part of the overall project documentation deliverables. 


The use of this custom application designed by Aldridge developers was a major key to success in keeping this fast-paced project on track. With a wealth of knowledge and experience on the type of complex work Aldridge completes, this strong team is a valuable asset throughout the organization. 


 

The Runway 7R/25L rehabilitation project at Los Angeles' LAX airport was a fast-paced runway rehabilitation of one of the most heavily used runways in the United States


The project was completed and the runway was re-opened on time. Aldridge worked nearly 12,000 work hours to complete our scope of work on this project. 


About the company: Aldridge is a life-cycle partner providing innovative solutions to complex energy and transportation projects across the country. To learn more, visit aldridgegroup.com 


 


The articles from these contributors are based on their personal expertise and viewpoints, and do not necessarily reflect the opinions of their employers or affiliated organizations.
The Leadership Perspectives forum brings together voices shaping the construction industry. Participation is by invitation only. It features leaders who are not merely observing industry changes, but actively contributing to them through operational expertise and project execution insights.
EDITOR'S CHOICE
  • Willis Towers Watson

    Cushman & Wakefield [NYSE: CWK]

    Projects Today Come Down to Nerves of Steel and Realistic Expectations

    Jason D’Orlando, Senior Managing Director, and Michael Morehead, Senior Director, Project and Development Services - Industrial

  • Willis Towers Watson

    Walmart [NYSE: WMT]

    Navgating the Challenges and Innovations in Mega Construction Projects: Building Competent Leadership and Embracing Technological Trends

    Seth Roy, Senior Director - Design & Construction, Walmart [NYSE: WMT]

  • Willis Towers Watson

    Meritage Homes [NYSE: MTH]

    Act Now to Address Aging Workforce

    Poli Peters, VP of Operations

  • Willis Towers Watson

    Advanced Drainage Systems [NYSE: WMS]

    Walking the sustainability walk: The case for EPR

    Brian King, EVP Marketing, Product Management and Sustainability, Advanced Drainage Systems, Inc. [NYSE: WMS]

Construction Business Review
Follow on LinkedIn

About

  • Home
  • About Us

Stay Connected

  • Subscribe
  • Newsletter
  • Sitemap

Contact Us

  • editor@constructionbusinessreview.com
  • sales@constructionbusinessreview.com
  • marketing@constructionbusinessreview.com

Legal

  • Editorial Policy
  • Privacy Policy
  • Terms of Use

© 2026 Construction Business Review. All rights reserved. Headquartered in Fort Lauderdale, FL, USA.

This content is copyright protected

However, if you would like to share the information in this article, you may use the link below:

https://www.constructionbusinessreview.com/leadership-perspective/custom-solutions-for-runway-rehab-innovative-equipment-tracking-applications-nwid-645.html

We use cookies on this website to enhance your user experience. By clicking any link on this page you are giving your consent for us to set cookies. More info

I agree