When Scientific Knowledge Must Work in the Field


Keeping Safety Non-Negotiable Amid Schedule and Cost Pressures
The honest answer is that safety, schedule, and cost aren't three equal weights on a scale. Safety isn't something we trade. The real challenge is making sure pressure from the other two never quietly erodes it. When a crew is behind and an outage window is closing, that's when shortcuts start to look reasonable. My job is to make sure our planning, resourcing, and contractor expectations never put people in that position to begin with.
The other challenge is where we build. A lot of our work happens in active roadways, steep terrain, and near rail corridors and sensitive habitat. A single project can involve a railroad, state agencies, environmental regulators, and multiple permitting jurisdictions. In my experience, schedule and cost risk rarely come from the work itself. They come from the seams between organizations.
Managing Project Complexity Through Early Planning and Stakeholder Alignment
I start by getting the right people in the room early, including the people who will actually do the work. Engineers, crews, contractors, and permitting staff all see different risks, and the cheapest time to address any of them is before mobilization.
From there, I try to be clear about three things: what we're building and why, what's non-negotiable, and who owns which decisions. Field leaders should be empowered to make field calls. My role is to clear obstacles, manage stakeholder relationships, and keep leadership informed early and often, especially when the news isn't good.
Schedule and cost risk rarely come from the work itself. They come from the seams between organizations.
We recently restored a transmission line after a slope failure that involved a railroad and several state and federal agencies. What made it work wasn't a perfect plan. It was steady communication and partners who trusted that we'd be straight with them.
How New Construction Methods and Technology Are Changing Utility Infrastructure
Three stand out. Emerging trenching and drilling methods are shifting utility construction away from traditional open-cut excavation toward less invasive and more efficient installation techniques. Improved drilling accuracy, faster production rates, and reduced restoration requirements will help crews complete work with fewer arterial impacts, less environmental disturbance, and lower overall project costs. Over time, these technologies will drive changes in project planning, crew composition, equipment needs, and construction sequencing across utility programs.
Second, the portfolio itself is shifting. Wildfire mitigation, undergrounding, and grid resilience are driving more complex work, and federal funding brings new compliance and contracting expectations that utilities and contractors both need to get fluent in.
Third is better use of data: tighter unit pricing, better estimating, and real-time visibility into production. But no technology replaces a skilled, well-trained workforce. The tools only pay off when the people using them are supported.
Building Trust, Field Credibility, and Stronger Teams Through Leadership
I came up through field work before moving into management, and the biggest lesson is never to lose respect for what it takes to do the work. I still spend time on job sites, because you can't lead what you don't understand.
Second, relationships are long-term. Our represented workforce and contractor partners will be with us for years. Being fair, consistent, and clear about expectations builds the trust you need when things go sideways.
Third, your success is measured by your team. Some of the most rewarding work I've done is developing supervisors and watching them grow into leaders. My background in environmental sciences also taught me to think in systems: a change in one part of a program always shows up somewhere else.
Preparing for Long-Term Careers in Utility Construction Management
Learn the business side early. Understand estimating, contracts, budgets, and how capital decisions get made. Those skills separate strong field leaders from strong managers.
Keep your field credibility. Crews know whether you understand the work, and that respect is earned, not granted by a title.
Get outside your lane. My time at Bonneville Power Administration gave me a broader view of the industry that I still draw on. Work across functions, take on stretch assignments, and keep learning through certifications and training.
Finally, find mentors, and then become one. This industry is built on people who took the time to teach the next generation. The work we do keeps the lights on for our communities, and it's a career worth investing in for the long haul.