Skip to: Curated Story Group 1
Visually Open Nav.
US
APAC
EUROPE
subscribe
Home
Sections
Sections
Abatement Services
Architectural Fabrication Services
Construction Demolition and Recycling
Construction Equipment
Construction Law
Construction Management
Construction Staffing
Exterior Construction
Foundation Construction
Landscaping
Marine Construction
Professional Services
Professional Services
Scaffolding Contractors
Structures
Structures
Swimming Pool Construction
Systems
Systems
Training Services
Workforce Management and Staffing
Leadership Perspectives
Innovation Insights
News
Conferences
Newsletter
CXO Awards
About Us
JUNE 2024CONSTRUCTIONBUSINESSREVIEW.COM8IN MYOPINIONMy specialty is a project manager owner's representative. I manage all construction and remodels at Tilly's retail store. We have 240 stores throughout the US. My role is similar to that of a general contractor project manager; we both manage architects, engineers, contracts, schedules, budgets, bidding, reading blueprints, correspondence, and warranty issues. While they are busy managing their superintendent and sub-contractors, I am busy looking at construction leasing exhibits from landlord developers, collecting tenant allowance, meeting with store operations my end user, handling one-off special projects like recladding storefronts, tracking deliveries, ordering products from vendors and managing delivery of owner furnished supplies to the job site.My general contractors tell me my current role is changing. My current status in other major retailers is relying more on architects and outsourced project managers to do their jobs. This has led to inconsistencies in the blueprint drawings, change orders and jobs missing schedules.By Michele Fleming, Construction Manager, TillysTHE FACETS OF THE RETAIL CONSTRUCTION SECTOR `OWNER PERSPECTIVE'The blueprint drawings are the most important part of a retailer's job. If the drawings have errors that are not corrected once determined, they will continue to be an unreliable source of buildability. General contractors following the drawings are incorrectly building details, and once brought to the owner's rep, they need to be revised, which costs time and money. Then, the same detail shows up on the next set of drawings because the owner's rep does not take the time to demand the architect fix the template set, causing change orders on the next job. Reading and understanding blueprints is detrimental for an owner's representative as this is where most change orders occur.Errors and omissions, unforeseen conditions, and building inspectors are among the top three change orders in my retail world. Errors and omissions are easy to eliminate by reading every note on the drawings, following every note to every detail, and making sure there are no inconsistencies. This is done before or during permit review and added in during the owner's comments period to allow for a clean set of drawings. Unforeseen conditions can catch
<
Page 7
|
Page 9
>